List of Figures
10
Figure 50: Unlocking the Handle on the AT-SBxPWRSYS1 Power Supply........................................................................ 94
Figure 51: Inserting the AT-SBxPWRSYS1 Power Supply.................................................................................................. 95
Figure 52: Lowering the Handle on the AT-SBxPWRSYS1 Power Supply.......................................................................... 96
Figure 53: Removing the Blank Slot Cover from Power Supply Slot A................................................................................ 98
Figure 54: Items Included with the AT-SBxPWRPOE1 Power Supply Module.................................................................... 99
Figure 55: Verifying the AT-SBxPWRPOE1 PoE Power Supply....................................................................................... 100
Figure 56: Unlocking the Handle on the AT-SBxPWRPOE1 Power Supply...................................................................... 100
Figure 57: Inserting the AT-SBxPWRPOE1 Power Supply............................................................................................... 101
Figure 58: Locking the Handle on the AT-SBxPWRPOE1 Power Supply......................................................................... 102
Figure 59: Removing the Blank Slot Cover from Power Supply Slot C.............................................................................. 104
Figure 60: Items Included with the AT-SBxPWRSYS1 DC Power Supply Module............................................................ 105
Figure 61: Loosening the Handle locking Screw on the AT-SBxPWRPOE1 DC Power Supply........................................ 106
Figure 62: Raising the Handle on the AT-SBxPWRPOE1 DC Power Supply.................................................................... 106
Figure 63: Inserting the AT-SBxPWRSYS1 DC Power Supply.......................................................................................... 107
Figure 64: Locking the Handle on the AT-SBxPWRSYS1 Power Supply.......................................................................... 108
Figure 65: Aligning Card in Slot......................................................................................................................................... 111
Figure 66: Slots 5 and 6 for the AT-SBx81CFC400 Card.................................................................................................. 112
Figure 67: Items Included with the AT-SBx81CFC400 Controller Fabric Card.................................................................. 113
Figure 68: Removing the AT-SBx81CFC400 Controller Fabric Card from the Anti-static Bag.......................................... 113
Figure 69: Opening the Locking Handles on the AT-SBx81CFC400 Controller Fabric Card ............................................ 114
Figure 70: Removing the Battery Insulator........................................................................................................................ 114
Figure 71: Aligning the AT-SBx81CFC400 Card in the Chassis Slot................................................................................. 115
Figure 72: Closing the Locking Levers on the AT-SBx81CFC400 Controller Fabric Card................................................ 116
Figure 73: Tightening the Thumb Screws on the AT-SBx81CFC400 Card....................................................................... 117
Figure 74: Removing an Ethernet Line Card from the Anti-static Bag............................................................................... 119
Figure 75: Aligning an Ethernet Line Card in a Chassis Slot............................................................................................. 119
Figure 76: Seating an Ethernet Line Card on the Backplane Connector........................................................................... 120
Figure 77: Tightening the Thumb Screws on an Ethernet Line Card................................................................................. 121
Figure 78: Installing a Blank Slot Cover............................................................................................................................. 122
Figure 79: Tightening the Thumbscrews on a Blank Slot Cover........................................................................................ 123
Figure 80: RJ Point 5 Cable Connector for AT-SBx81GT40 Line Card............................................................................. 127
Figure 81: Connecting Cables to Ports on the AT-SBx81GT40 Line Card........................................................................ 128
Figure 82: Removing the Dust Cover from an SFP Slot in the AT-SBx81GS24a Line Card............................................. 130
Figure 83: Handle on SFP Transceiver.............................................................................................................................. 131
Figure 84: Inserting the SFP Transceiver in the AT-SBx81GS24a Line Card................................................................... 131
Figure 85: Removing the Dust Cover from the SFP Transceiver in the AT-SBx81GS24a Line Card................................ 132
Figure 86: Verifying the Position of the Handle on the SFP Transceiver on the AT-SBx81GS24a Line Card................... 132
Figure 87: Attaching a Fiber Optic Cable to an SFP Transceiver in the AT-SBx81GS24a Line Card............................... 133
Figure 88: Removing the Dust Cover from an SFP+ Slot in the AT-SBx81XS6 Line Card............................................... 134
Figure 89: Handle on SFP+ Transceiver........................................................................................................................... 135
Figure 90: Installing an SFP+ Transceiver in the AT-SBx81XS6 Line Card...................................................................... 135
Figure 91: Removing the Dust Cover from an SFP+ Transceiver in the AT-SBx81XS6 Line Card................................... 136
Figure 92: Verifying the Position of the Handle on the SFP+ Transceiver on the AT-SBx81XS6 Line Card..................... 136
Figure 93: Attaching a Fiber Optic Cable to an SFP+ Transceiver in the AT-SBx81XS6 Line Card................................. 137
Figure 94: Removing the Dust Cover From an SFP+ Slot in the AT-SBx81XS6 Line Card.............................................. 138
Figure 95: Release Tab on the AT-SBx81XS6 Line Card.................................................................................................. 139
Figure 96: Installing the AT-SP10TW Cable in the AT-SBx81XS6 Line Card ................................................................... 139
Figure 97: AC Sockets on the Rear Panel of the AT-SBx8106 Chassis............................................................................ 145
Figure 98: Connecting the AC Power Cord for the AT-SBxPWRSYS1 AC Power Supply................................................ 146
Figure 99: Securing the Power Cord for the AT-SBxPWRSYS1 AC Power Supply to an Anchor..................................... 147
Figure 100: Connecting the AC Power Cord for the AT-SBxPWRPOE1 Power Supply.................................................... 148
Figure 101: Securing the Power Cord for the AT-SBxPWRPOE1 Power Supply to an Anchor........................................ 149
Figure 102: Dress and Secure AC Power Cords............................................................................................................... 150
Figure 103: Components of the AT-SBxPWRSYS1 DC Power Supply............................................................................. 152
Figure 104: Grounding Wire Terminal................................................................................................................................ 153
Figure 105: Stripping the Stranded Grounding Wire.......................................................................................................... 153
Figure 106: Attaching the Stranded Grounding Wire to the Grounding Terminal.............................................................. 153
Figure 107: Removing the Nut and Washer from the Grounding Post.............................................................................. 154
Figure 108: Installing the Grounding Wire......................................................................................................................... 155
Figure 109: Stripping the solid or Stranded Grounding Wire............................................................................................. 156