Manuals
/
Allied Telesis
/
Computer Equipment
/
Switch
Allied Telesis
X8106
manual
Attaching the Bare Grounding Wire to the Grounding Post 156
Models:
X8106
1
11
240
240
Download
240 pages
38.86 Kb
8
9
10
11
12
13
14
15
Troubleshooting
Specifications
Install
Pin Signal
Grounding wire
Reviewing Safety Precautions
Safety
Power Supply Units
Feature Description
On/Off Switch
Page 11
Image 11
SwitchBlade x8106 Chassis Switch Installation Guide
Figure 110: Attaching the Bare Grounding Wire to the Grounding Post
156
Figure 111: Securing the Bare Grounding Wire to the Grounding Post
157
Figure 112: Power Wire Terminals
158
Figure 113: Stripping the Power Wires
159
Figure 114: Attaching the Power Wires to the Straight Terminal Lugs
159
Figure 115: On/Off Switch on the
AT-SBxPWRSYS1
DC Power Supply
160
Figure 116: Opening the Plastic Cover
161
Figure 117: Removing the Terminal Screws
162
Figure 118: Connecting the Positive (+) Power Wire with a Straight Terminal
163
Figure 119: Connecting the Negative
(-)
Power Wire with a Straight Terminal
164
Figure 120: Closing the Plastic Cover over the Terminal Connectors
165
Figure 121: Tightening the Handle Locking Screw
166
Figure 122: Stripping the Power Wires
167
Figure 123: Attaching the Power Wires to the Right Angle Terminals
167
Figure 124: Removing the Plastic Cover
168
Figure 125: Removing the Terminal Screws
169
Figure 126: Connecting the Positive (+) Power Wire with a Right Angle Terminal
170
Figure 127: Connecting the Negative
(-)
Power Wire with a Right Angle Terminal
171
Figure 128: Tightening the Handle Locking Screw
172
Figure 129: Stripping Solid or Stranded DC Power Wires
173
Figure 130: Connecting the Positive Lead Wire
174
Figure 131: Connecting the Negative Lead Wire
175
Figure 132: Switch Initialization Messages
178
Figure 133: Switch Initialization Messages (Continued)
179
Figure 134: Connecting the Management Cable to the Console
RS-232
Port
184
Figure 135: SHOW VERSION Command
186
Figure 136: SHOW CARD Command
186
Figure 137: Disconnecting the AC Power Cord from the AC Socket on the Back Panel
206
Figure 138: Lifting the Locking Handle on the Power Supply
207
Figure 139: Removing the Power Supply from the Chassis
208
Figure 140: Installing a Blank Power Supply Slot Cover
209
Figure 141: Lowering the Locking Handle on the Power Supply Slot Cover
210
Figure 142: Loosening the Screw on the Locking Handle
211
Figure 143: Opening the Plastic Window on the Terminal Block
212
Figure 144: Removing the Negative Lead Wire
213
Figure 145: Removing the Positive Lead Wire from the Terminal Block
214
Figure 146: Reinstalling the Screws on the Positive and Negative Terminals
215
Figure 147: Closing the Plastic Cover
216
Figure 148: Removing the Grounding Wire
217
Figure 149: Reinstalling the Nut and Washer on the Grounding Post
218
Figure 150: Lifting the Locking Handle and Removing the Power Supply
219
Figure 151: Installing a Blank Power Supply Slot Cover
220
Figure 152: Lowering the Locking Handle on the Power Supply Slot Cover
221
Figure 153: Loosening the Screw on the
AT-SBxFAN06
Fan Module
227
Figure 154: Loosening the
AT-SBxFAN06
Fan Module from the Backplane Connector
227
Figure 155: Withdrawing the
AT-SBxFAN06
Fan Module 25 mm (1 in.) from the Chassis
228
Figure 156: Removing the
AT-SBxFAN06
Fan Module from the Chassis
229
Figure 157: Installing a New
AT-SBxFAN06
Fan Module
230
Figure 158: Securing the
AT-SBxFAN06
Fan Module on the Backplane Connector
231
Figure 159: Tightening the Screw on the
AT-SBxFAN06
Fan Module
231
Figure 160:
Pin Numbers for
RJ-45
and RJ Point 5 Ports (Front View)
239
11
Page 10
Page 12
Page 11
Image 11
Page 10
Page 12
Contents
Installation Guide
Copyright 2013 Allied Telesis, Inc
Electrical Safety and Emissions Standards
Translated Safety Statements
Contents
125
181
Contents
Figures
Unlocking the Handle on the AT-SBxPWRSYS1 Power Supply
Attaching the Bare Grounding Wire to the Grounding Post 156
List of Figures
Tables
List of Tables
Preface
Safety Symbols Used in this Document
Contacting Allied Telesis
Preface
Chapter
Overview
Ethernet Line Cards and Controller Card
Introduction
Power Supply Units
Fan Module
AT-SBx8106 Chassis
Ethernet Line Controller Cards Slots
Power Supply Slots
Overview
AT-SBx81GT24 Line Card
AT-SBx81GT40 Line Card
AT-SBx81GP24 PoE Line Card
AT-SBx81GS24a SFP Line Card
AT-SBx81XS6 SFP+ Line Card
10/100/1000Base-T Twisted Pair Ports
Connector Type Speed Duplex Mode
Maximum Distance Cable Requirements
Automatic Mdix Detection Port Pinouts
Powered Device Classes
Power over Ethernet on the AT-SBx81GP24 Line Card
Maximum Number Class Ports with
SwitchBlade x8106 Chassis Switch Installation Guide
AT-SBx81GT24 Line Card
Port LEDs on the Ethernet Line Cards
AT-SBx81GT40 Line Card
LEDs
AT-SBx81GP24 Line Card
AT-SBx81GS24a Line Card
AT-SBx81XS6 Line Card
AT-SBx81CFC400 Controller Fabric Card
Components on the card are identified in Figure
CFC
SBx Status LEDs
Eco-friendly Button Reset Button
NET Mgmt Port
Feature Description
NET Mgmt LED
Overview
AT-SBxPWRSYS1 AC Power Supply
LED
AT-SBxPWRPOE1 Power Supply
AT-SBxPWRPOE1 Power Supply LEDs
AT-SBxPWRSYS1 DC Power Supply
OUT
AT-SBxFAN06 Module
Power Supply Interfaces Opto-couplers
Power Supply Interface LED
Model Number Initial Release
Safety Precautions and Site Requirements
Reviewing Safety Precautions
SwitchBlade x8106 Chassis Switch Installation Guide
Safety Precautions and Site Requirements
SwitchBlade x8106 Chassis Switch Installation Guide
Selecting a Site for the SwitchBlade
125 VAC 125 V Nema 5-20 Plug and Receptacle
Installation Tools and Material
Installing the Chassis in an Equipment Rack
Required Tools and Material
Preparing the Equipment Rack
Reserving Vertical Rack Space
SwitchBlade x8106 Chassis Switch Installation Guide
Components of the AT-SBx8106 Chassis
Unpacking the AT-SBx8106 Chassis
Components of the AT-SBx8106 Chassis
Removing the Rubber Feet
SwitchBlade x8106 Chassis Switch Installation Guide
Adjusting the Equipment Rack Brackets
Rack Bracket Locations for Reverse Position of Chassis
Installing the Chassis in the Equipment Rack
SwitchBlade x8106 Chassis Switch Installation Guide
Screws
Screws
Removing the Shipping Brace
Removing the Grounding Lug
Installing the Chassis Grounding Lug
Installing the Chassis in an Equipment Rack
Installing the Power Supplies
Protecting Against Electrostatic Discharge ESD
Installing the AT-SBxPWRSYS1 AC System Power Supply
Installing the Power Supplies
SwitchBlade x8106 Chassis Switch Installation Guide
Unlocking the Handle on the AT-SBxPWRSYS1 Power Supply
Inserting the AT-SBxPWRSYS1 Power Supply
Installing the Power Supplies
Installing the AT-SBxPWRPOE1 PoE Power Supply
Installing the Power Supplies
SwitchBlade x8106 Chassis Switch Installation Guide
100
Inserting the AT-SBxPWRPOE1 Power Supply
102
Installing the AT-SBxPWRSYS1 DC Power Supply
104
105
106
Inserting the AT-SBxPWRSYS1 DC Power Supply
108
109
Guidelines to Handling the Controller and Line Cards
Aligning Card in Slot
Installing the AT-SBx81CFC400 Controller Fabric Card
113
114
115
116
117
Installing the Ethernet Line Cards
Shows an Ethernet line card aligned with slot
120
121
Installing the Blank Slot Covers
123
Page
Installing the Transceivers and Cabling the Ports
Installing the Transceivers and Cabling the Ports
Connecting Cables to the AT- SBx81GT40 Line Card
Connecting Cables to Ports on the AT-SBx81GT40 Line Card
Guidelines to Installing SFP and SFP+ Transceivers
Installing SFP Transceivers in the AT-SBx81GS24a Line Card
131
132
133
Installing SFP+ Transceivers in the AT-SBx81XS6 Line Card
135
136
137
Installing AT-SP10TW Cables in the AT-SBx81XS6 Line Card
139
140
Cabling the NET Mgmt Port on the AT-SBx81CFC400 Card
142
Powering On the Chassis
Verifying the Installation
Powering On the AT-SBxPWRSYS1 AC Power Supply
146
Anchor
Powering On the AT-SBxPWRPOE1 Power Supply
149
150
Powering On the AT-SBxPWRSYS1 DC System Power Supply
152
153
154
Grounding wire
Connecting Grounding Wire With Bare Wire
157
Connecting the DC Power Wires with the Straight Terminals
159
On/Off Switch
161
162
163
164
165
Handle locking screw
Connecting DC Power Wires With the Right Angle Terminals
168
169
170
171
Handle locking screw
Connecting Bare DC Power Wires
174
175
176
Monitoring the Initialization Process
Switch Initialization Messages
179
Powering On the Chassis 180
Verifying the Hardware Operations of the Chassis
Using the LEDs to Verify the Chassis
183
Starting a Local Management Session
Using Local Management to Verify the Chassis
Entering AlliedWare Plus Operating System Commands
Number
187
Verifying the Hardware Operations of the Chassis 188
Troubleshooting
AT-SBxPWRSYS1 and AT-SBxPWRPOE1 AC Power Supplies
191
192
Ethernet Line Cards
Awplus# show card
Twisted Pair Ports
196
Power Over Ethernet
198
Fiber Optic Transceivers
200
AT-SBxFAN06 Fan Module
Local Out-of-Band Management Session
203
Troubleshooting 204
Replacing Modules
Replacing AT-SBxPWRSYS1 AC and AT-SBxPWRPOE1 Power Supplies
Lift the locking hand on the power supply. Refer to Figure
208
209
Lowering the Locking Handle on the Power Supply Slot Cover
Loosening the Screw on the Locking Handle
Replacing the AT-SBxPWRSYS1 DC Power Supply
212
213
214
215
216
217
218
219
220
Lowering the Locking Handle on the Power Supply Slot Cover
Replacing Ethernet Line Cards
223
Replacing the AT-SBx81CFC400 Controller Fabric Card
225
Removing AT-SBxFAN06 Fan Module
Replacing the AT-SBxFAN06 Fan Module
227
Slowly pull the module out 25 mm 1 in.. Refer to Figure
Installing a New AT-SBxFAN06 Fan Module
230
231
Replacing Modules 232
Appendix a
Physical Specifications
Appendix a Technical Specifications
Product Quantity
Environmental Specifications
AC Voltage, Frequency Requirements Volts, Hertz
Power Specifications
Maximum power supply efficiency based on 100V input voltage
Safety and Electromagnetic Emissions
Safety and Electromagnetic Emissions Certifications
Port Pinouts
Pin Signal
Pin Pair Signal
Top
Page
Image
Contents