SwitchBlade x8106 Chassis Switch Installation Guide

2.Lift the AT-SBx8106 Chassis into the equipment rack and set the bottom of the equipment rack brackets firmly on the two equipment rack screws you installed in “Preparing the Equipment Rack” on page 73, as shown in Figure 37.

Figure 37. Lifting the AT-SBx8106 Chassis into the Equipment Rack

3.With the bottom of the rack mount ears resting on the two rack mount screws, tilt the top of the chassis back until both rackmount brackets are flush and parallel with the vertical rack rails.

4.Install four rack mount screws (not provided) to secure the chassis to the equipment rack, as shown in Figure 38 on page 84.

83

Page 83
Image 83
Allied Telesis X8106 manual SwitchBlade x8106 Chassis Switch Installation Guide