SwitchBlade x8106 Chassis Switch Installation Guide | |
Monitoring the Initialization Process | 177 |
Using the LEDs to Monitor the Initialization Process | 177 |
Using the Console Port to Monitor the Initialization Process | 177 |
Chapter 8: Verifying the Hardware Operations of the Chassis | 181 |
Using the LEDs to Verify the Chassis | 182 |
Using Local Management to Verify the Chassis | 184 |
Starting a Local Management Session | 184 |
Entering the AlliedWare Plus Operating System Commands | 185 |
Chapter 9: Troubleshooting | 189 |
190 | |
191 | |
Ethernet Line Cards | 193 |
Twisted Pair Ports | 195 |
Power Over Ethernet | 197 |
Fiber Optic Transceivers | 199 |
200 | |
201 | |
Local | 202 |
Power Supply Interfaces | 203 |
Chapter 10: Replacing Modules | 205 |
Replacing | 206 |
Replacing the | 211 |
Replacing Ethernet Line Cards | 222 |
Replacing the | 224 |
Replacing the | 226 |
Removing the | 226 |
Installing a New | 229 |
Appendix A: Technical Specifications | 233 |
Physical Specifications | 233 |
Environmental Specifications | 235 |
Power Specifications | 236 |
Safety and Electromagnetic Emissions Certifications | 238 |
Port Pinouts | 239 |
7