CV7 Touch Panel Accessories

Before beginning the installation of the battery base to the Modero panel, verify the Modero panel has the latest firmware. Only the latest build incorporates the necessary updates for using the Modero with the NXA-BASE/1. From the Battery Base page, verify that the battery base is loaded with the latest NXA-BASE/1 firmware (v2.xx or higher).

Checking the NXT-BP charge

1.Press the Battery Life Indicator button (FIG. 24) once to illuminate the Battery Life LEDs and display the percent charge remaining on the battery (this indication lasts a few seconds).

Battery Life (Charge) Display

Battery Life Indicator button

FIG. 24 NXT-BP Battery Pack (showing the battery life indicator and button)

2.Charge the NXT-BP battery by either inserting it into the battery base or from within the optional NXT-CHG charger (which can sequentially charge up to two batteries).

It is recommended to fully charge this battery before using it to power an NXT-CV7 panel. If the 25% LED indicator is blinking, recharge your battery immediately. This blinking indicates there is less than 5% of a charge remaining on the battery.

Installing an NXT-BP into the NXA-BASE/1

The base does not directly connect to a power supply. Instead, it receives the power necessary to charge the battery from the Modero panel (through the Panel Interface connector).

1.Install the NXT-BP battery into the base’s battery compartment with the label-side facing up.

2.Align the battery connector with its corresponding battery connector port (located in the battery compartment shown in FIG. 25).

NXT-BP Battery

Battery

Connector

Battery

Connector

Port

FRONT

FIG. 25 Battery installation

7" Modero Widescreen Touch Panels

23

 

 

 

 

Page 31
Image 31
AMX NXT-CV7, NXD-CV7 instruction manual Checking the NXT-BP charge, Installing an NXT-BP into the NXA-BASE/1, Front