13-10Programming Considerations

Using Special Programming Routines

4.Ensure that data does not change in the block-transfer data table output file until the BTW is complete.

 

BT10:1

 

 

 

 

 

BTW data valid

 

 

 

 

 

DN

 

 

 

 

 

 

OTU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BTW data valid

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BT10:1

 

 

 

 

 

 

 

 

 

 

 

 

 

/

 

BTW

 

 

 

 

 

EN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EN

Rack

01

 

 

DN)

false-to-true

 

 

 

 

Group

4

 

ER)

transition

Module

0

 

 

 

 

 

 

 

 

 

 

Control Block

BT10:1

 

 

 

 

 

 

 

 

 

 

Data File

N11:0

 

 

 

 

 

 

 

 

 

 

Length

6

 

 

 

 

 

 

 

 

 

 

Continuous

N

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BTW instruction must be

 

 

 

 

 

 

 

 

 

above this logic

 

 

 

 

 

BT10:1

 

 

 

 

 

 

 

 

 

 

 

 

/

 

 

 

 

 

any logic that

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EN

 

 

 

modifies the

 

 

 

 

 

 

 

 

 

 

 

 

BTW output file

 

 

 

 

 

 

 

 

 

 

 

 

data

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BTW data valid

OTL)

 

[END OF FILE]

 

41402

 

 

 

 

 

 

 

 

Use your design specification to determine if you need one or more of the following special programming routines:

power-up routines

fault-driven routines (necessary to safely manage equipment faults)

time-driven interrupt routines (selectable timed interrupts)

event-driven interrupt routines (controller input interrupts)

The following table explains when to use these programming features.

Publication 1785-UM012D-EN-P - July 2005

Page 228
Image 228
Bradley Smoker PLC-5 user manual Using Special Programming Routines, 13-10Programming Considerations