Bradley Smoker PLC-5 user manual Preparing Power-Up Routines, Setting Power-Up Protection, Scan

Models: PLC-5

1 388
Download 388 pages 13.97 Kb
Page 235
Image 235

Chapter 14

Using This Chapter

Setting Power-Up Protection

Preparing Power-Up Routines

For Information About:

Go to Page

Setting power-up protection

14-1

 

 

Allowing or inhibiting startup

14-2

 

 

Defining controller power-up

14-2

procedure

 

 

 

You can configure your controller so that if a power-loss is experienced while in run mode, the controller does not come back up in run mode. User control bit S:26/1 defines whether power-up protection (e.g., fault routine) is executed upon power-up.

If S:26/1 is

After power loss, the controller

Set (1)

Scans the fault routine before returning to normal program

 

scan

 

When set, the controller scans the fault routine once to

 

completion after the controller recovers from a power loss.

 

You can program the fault routine to determine whether the

 

controller’s status will let the controller respond correctly to

 

logic and whether to allow or inhibit the startup of the

 

controller.

 

 

Reset (0)

Powers up directly at the first rung on the first program file

 

 

Set S:26/1 manually from the Controller Status screen, or latch this bit through ladder logic.

Publication 1785-UM012D-EN-P - July 2005

Page 235
Image 235
Bradley Smoker PLC-5 user manual Preparing Power-Up Routines, Setting Power-Up Protection, Scan