Cisco Systems OL-11497-03 manual Verifying the Installation of the Switch Fabric Card

Models: OL-11497-03

1 344
Download 344 pages 57.99 Kb
Page 308
Image 308

Chapter 6 Maintaining the Router

Removing and Installing a Clock and Scheduler Card, Switch Fabric Card, or Alarm Card

Caution SFC ejector levers may not fit flush against the SFC faceplate. To ensure that the SFC is properly seated and ensure EMC compliance, tighten the captive screws. Do not overtighten the captive screws; you might strip the threads on the screw or in the insert in the chassis.

Step 8 Tighten the captive screw on each side of the SFC faceplate.

Verifying the Installation of the Switch Fabric Card

To verify router operation after installing a replacement SFC, see the “Verifying the Installation of the Clock and Scheduler Card” section on page 6-60. The description of the LEDs applies equally to checking SFC operation.

 

Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide

6-64

OL-11497-03

Page 308
Image 308
Cisco Systems OL-11497-03 manual Verifying the Installation of the Switch Fabric Card