Cisco Systems OL-11497-03 manual Reconnecting Cables to a Line Card

Models: OL-11497-03

1 344
Download 344 pages 57.99 Kb
Page 14
Image 14

Contents

Reconnecting Cables to a Line Card 6-54

Removing and Installing a Clock and Scheduler Card, Switch Fabric Card, or Alarm

Card 6-56

Tools and Equipment 6-57

Removing and Installing a Clock and Scheduler Card 6-57

Removing a Clock and Scheduler Card

6-58

Installing a Clock and Scheduler Card

6-59

Verifying the Installation of the Clock and Scheduler Card 6-60

 

 

Removing and Installing a Switch Fabric Card

6-61

 

 

 

Removing a Switch Fabric Card

6-62

 

 

 

 

Installing a Switch Fabric Card

6-63

 

 

 

 

Verifying the Installation of the Switch Fabric Card 6-64

 

 

Removing and Installing an Alarm Card

6-65

 

 

 

 

Removing an Alarm Card

6-66

 

 

 

 

 

 

Installing an Alarm Card

6-66

 

 

 

 

 

 

Verifying the Installation of the Alarm Card 6-67

 

 

Removing and Installing the Chassis

6-68

 

 

 

 

 

Tools and Equipment 6-68

 

 

 

 

 

 

 

 

Before You Begin 6-69

 

 

 

 

 

 

 

 

Preparing the Replacement Chassis

6-69

 

 

 

 

Preparing the Defective Chassis

6-70

 

 

 

 

 

Disconnecting Power from the Power Distribution Unit 6-70

 

 

Disconnecting RP Cables

6-70

 

 

 

 

 

 

Disconnecting Line Card Interface Cables

6-71

 

 

 

Disconnecting Alarm Card Cables

6-71

 

 

 

 

Transferring System Components

6-71

 

 

 

 

 

Transferring RP and Line Cards

6-72

 

 

 

 

Transferring the Clock and Scheduler, Switch Fabric, and Alarm

 

 

Cards 6-72

 

 

 

 

 

 

 

 

Transferring the Power Modules

6-73

 

 

 

 

Cisco 12006 and Cisco 12406 Router Installation and Configuration Guide

 

 

 

 

 

 

12

 

 

 

 

 

 

OL-11497-03

 

 

 

 

 

 

 

 

Page 14
Image 14
Cisco Systems OL-11497-03 manual Reconnecting Cables to a Line Card