5–76CLI Commands

Table 5–4 Poweroff Switch Settings (Continued)

Battery

Override Switch

Flush

Action

Switch

 

Results

 

 

 

 

 

BATTERY_OFF

OVERRIDE_BAD_FLUSH

Success

Controller and units in the cabinet are

 

 

 

shutdown and the ECB is not powering the

 

 

 

cache module.

 

 

 

 

BATTERY_OFF

OVERRIDE_BAD_FLUSH

Failure

Controller and units in the cabinet are

 

 

 

shutdown and the ECB is not powering the

 

 

 

cache module.

 

 

 

 

BATTERY_OFF

NO_OVERRIDE_BAD_FLUSH

Success

Controller and units in the cabinet are

 

 

 

shutdown and the ECB is not powering the

 

 

 

cache module.

 

 

 

 

BATTERY_OFF

NO_OVERRIDE_BAD_FLUSH

Failure

Nothing is shutdown, the ECB is powering

 

 

 

the cache module, and user is notified of a

 

 

 

bad flush.

 

 

 

 

In dual-redundant controller configurations, if both controllers can’t be shutdown, then both controllers and their ECB chargers remain on.

Example

This example shows how to power off the disk units and the cabinet in 10 seconds:

POWEROFF SECONDS=10

Page 262
Image 262
Compaq HSZ80 manual 76CLI Commands, Poweroff SECONDS=10