2–11

Table 2–2 Location of Parts for Transparent Failover

Item

Description

Host port 1

Host port 2

Trilink connector

Host bus cable

Ferrite bead

Terminator

Jumper cable

Follow these steps to configure a controller:

NOTE: This procedure has been written for first-time configuring. However, you can adapt the procedure when you reconfigure the controllers. For replacing and upgrading the controllers, see the HSZ80 Array Controller ACS Version 8.3 Maintenance and Service Guide.

1.Use the power-verification and addressing (PVA) module ID switch to set the SCSI ID number for the BA370 rack-mountable enclosure.

See “Setting the PVA Module ID Switch,” page 2–25,for details about PVA switch settings.

2.Remove the program card ESD cover, and insert the program card into the controller. Replace the ESD cover. Repeat for the other controller.

3.Turn on the power to the enclosure or cabinet by turning on the ac input boxes.

4.Establish a local connection to the controllers.

See “Establishing a Local Connection to the Controller,” page 2–26,for details about creating a local connection.

Compaq HSZ80 Array Controller ACS Version 8.3 Configuration and CLI Reference Guide

Page 65
Image 65
Compaq HSZ80 manual Location of Parts for Transparent Failover