Item

Indicator, Button, or

Icon

Description

 

Connector

 

 

 

 

 

 

5

Power-on indicator/

 

The power-on indicator lights when the

 

power button

 

sled power is on. The power-on indicator

 

 

 

lights amber when the system critical

 

 

 

event occurs.

 

 

 

NOTE: The power-on indicator lights amber

 

 

 

according to critical system error log (SEL)

 

 

 

assertion. If the SEL is full or a deassertion

 

 

 

event occurred while sensor monitoring is

 

 

 

paused (e.g. fan monitoring is paused during

 

 

 

system power off), the power-on indicator

 

 

 

turns amber. To turn off an amber LED and

 

 

 

reset the power-on indicator to normal

 

 

 

condition (solid green), either perform a

 

 

 

BMC cold reset or reseat the sled in the

 

 

 

server enclosure.

 

 

 

The power button turns the compute

 

 

 

sled on.

 

 

 

NOTES:

 

 

 

• When powering on the sled, the video

 

 

 

monitor can take from several seconds to

 

 

 

over 2 minutes to display an image,

 

 

 

depending on the amount of memory

 

 

 

installed in the system.

 

 

 

• On ACPI-compliant operating systems,

 

 

 

turning off the sled using the power

 

 

 

button causes the sled to perform a

 

 

 

graceful shutdown before power to the

 

 

 

sled is turned off.

 

 

 

• To force an ungraceful shutdown, press

 

 

 

and hold the power button for five

 

 

 

seconds.

6

VGA connector

 

Connects a VGA display to the system.

7

Serial connector

 

Connects a serial device to the system.

About Your System

13

Page 13
Image 13
Dell C8220 owner manual Indicator, Button, or Icon Description Connector, Server enclosure