Exabyte 1X7 LTO manual Powering on the Autoloader, Requirements for other locations

Models: 1X7 LTO

1 162
Download 162 pages 8.36 Kb
Page 35
Image 35

POWERING ON THE AUTOLOADER

When you perform autoloader configuration, you will configure the autoloader’s Ethernet interface (see page 35).

POWERING ON THE AUTOLOADER

To power on the autoloader:

1.Make sure that the power switch on the back of the autoloader is off (press the 0).

Power switch

Power cord connection

Figure 2-11Location of the power switch and power connector

2.Connect the female end of the power cord to the power connector on the back of the autoloader.

 

 

! Important

Two power cords are shipped with the autoloader: One for use in

 

the US and Canada, and one for use in Europe. Use the correct

 

power cord for your location. See page 122 for power cord

 

requirements for other locations.

 

 

3.Plug the male end of the power cord into the power source.

4.Push the power switch on the back of the autoloader to the on position (press the I). The autoloader performs its power-on sequence. During this time, the following activities occur:

The cooling fan begins to operate. The LCD illuminates.

The tape drive and autoloader perform self-tests.

The autoloader calibrates the positions of the cartridge cells.

The autoloader checks each cartridge cell to determine if a cartridge is present and updates the cartridge inventory.

5.If necessary, set the SCSI IDs for the autoloader and the tape drive. You can use the default IDs or change them if they conflict with other devices on the SCSI bus. See page 29 for instructions.

OCTOBER 2006

MAGNUM 1X7 LTO AUTOLOADER

 

 

 

 

 

 

 

 

19

Page 35
Image 35
Exabyte 1X7 LTO manual Powering on the Autoloader, Power cord for your location. See page 122 for power cord