Lucent Technologies 3000, 3100 manual Lucent Supplied Equipment, Rack Installation, Operational

Models: 3100 3000

1 144
Download 144 pages 3.44 Kb
Page 38
Image 38

Rack Installation

Rack Installation

Introduction This chapter provides the following information: Pre-installation requirements

How to install the Rack hardware

How to wire the Rack backplane for connections to the

qPSTN and DEFINITY ECS. Complete power-up sequence

Lucent Supplied Equipment

DEFINITY Extender Model ® 3000

DEFINITY Extender Model ® 3100

(sold separately from Rack

One twelve slot Rack mountable chassis One power cord

One System Administrator’s Guide

Switch Management Interface software (2 disks)

qOne Analog Switch Card One Quick Installation Guide

Operational

The Rack is to be used with DEFINITY ECS

Considerations

Version 3, Release 3 or later.

 

Order a separate central office (CO) line at each

 

remote module location.

 

Each Switch Card will need a digital port

 

(extension) from the DEFINITY ECS, and an

 

qanalog line from the (CO) or the DEFINITY ECS.

 

Be sure that the DEFINITY ECS digital port to

 

which the Switch Card is connected is

 

programmed correctly for the telephone type

 

being used at the remote location.

 

Remote Modules, desksets and communication

 

qline cords are NOT supplied with this system.

 

Use two-wire digital display phones only.

3-2Issue 1 October 1998

Page 38
Image 38
Lucent Technologies 3000, 3100 manual Lucent Supplied Equipment, Rack Installation, Operational, Considerations