Rack Installation
Before you Power Up the Rack
Introduction | This procedure will detail the necessary steps to perform |
| BEFORE bringing the loaded Rack online. |
Rack | The Rack is secured properly. |
Checklist |
|
| The power cord is connected. |
Rack position “Card 0” contains the latest Switch Card
q(Model 3100) loaded.
The appropriate
Safety
Checklist
| IMPORTANT SAFETY INSTRUCTIONS |
| Do not install this product near water, for example, in |
| a wet basement location. |
| Do not overload wall outlets, as this can result in the |
| qrisk of fire or electrical shock. |
| Do not attach the power supply cord to building |
| surfaces. Do not allow anything to rest on the power |
| cord. Do not locate this product where the cord will |
| qbe abused by persons walking on it. |
| Do not operate the system if chemical gas leakage is |
| suspected in the area. Use telephones located in some |
| other safe area to report the trouble. |
Power Up | If the above checklist is OK, plug the Rack into the AC |
| |
| outlet. |
| Issue 1 October 1998 |