Rack Installation
How to prepare the site for installation
Location | The maximum length of cable between the Rack |
Checklist | qand the DEFINITY ECS is 500 ft (150 meters). |
| The Rack’s power supply and cabling should be |
| installed away from high power/high RF noise |
| devices such as computers, fans, fluorescent ballast, |
| power supplies, etc. |
| Use good wiring practices. Do not run wires over |
| fluorescent lights, computers, air conditioners, etc. |
| qas this can introduce noise to the modems. |
| The Rack must be installed in a secure location. |
| Unauthorized access to the Rack could lead to toll |
| fraud. |
Reference | Refer to the DEFINITY ECS Communications System |
Document | Generic 3, Installation for |
| manual, document |
| #107595423, for further information. |
Installation | Four |
Requirements | Rack |
| One DCP line for each Model 3100 Switch Card |
| One analog line for each Model 3100 Switch Card |
| |
| Additional cables sufficient for the DCP and analog |
| lines. |
DEFINITY ECS | Install |
Checklist | Connect the DCP lines from the DEFINITY ECS to |
| the |
| Connect two of the |
| digital ports (P106 and P108) |
| |
| DEFINITY DCP lines (see Tables |
| this Chapter) |
| Connect the analog lines from the PSTN or |
| DEFINITY ECS to the |
| Connect the two remaining |
| qRack PSTN ports (P107 and P105). |
| |
| lines (see Tables |