Rack Installation

How to prepare the site for installation

Location

The maximum length of cable between the Rack

Checklist

qand the DEFINITY ECS is 500 ft (150 meters).

 

The Rack’s power supply and cabling should be

 

installed away from high power/high RF noise

 

devices such as computers, fans, fluorescent ballast,

 

power supplies, etc.

 

Use good wiring practices. Do not run wires over

 

fluorescent lights, computers, air conditioners, etc.

 

qas this can introduce noise to the modems.

 

The Rack must be installed in a secure location.

 

Unauthorized access to the Rack could lead to toll

 

fraud.

Reference

Refer to the DEFINITY ECS Communications System

Document

Generic 3, Installation for Single-Carrier Cabinets

 

manual, document #555-230-894, comcode

 

#107595423, for further information.

Installation

Four 25-pair cables with female connectors for each

Requirements

Rack

 

One DCP line for each Model 3100 Switch Card

 

One analog line for each Model 3100 Switch Card

 

110-blocks sufficient for the installation

 

Additional cables sufficient for the DCP and analog

 

lines.

DEFINITY ECS

Install 110-blocks

Checklist

Connect the DCP lines from the DEFINITY ECS to

 

the wall-field.

 

Connect two of the 25-pair cables to the Rack

 

digital ports (P106 and P108)

 

Cross-connect the Rack digital ports to the

 

DEFINITY DCP lines (see Tables 3-2and 3-3in

 

this Chapter)

 

Connect the analog lines from the PSTN or

 

DEFINITY ECS to the wall-field.

 

Connect the two remaining 25-pair cables to the

 

qRack PSTN ports (P107 and P105).

 

Cross-connect the Rack PSTN ports to the analog

 

lines (see Tables 3-4and 3-5in this Chapter)

3-4Issue 1 October 1998