Motorola IH5 manual Installing the MCPN750A Baseboard

Models: IH5 MCPN750A

1 186
Download 186 pages 32 Kb
Page 44
Image 44
Installing the MCPN750A Baseboard

1

Hardware Preparation and Installation

Installing the MCPN750A Baseboard

With mezzanine board(s) installed (if applicable) and headers properly configured, proceed as follows to install the MCPN750A in the CompactPCI chassis:

1.Attach an ESD strap to your wrist. Attach the other end of the ESD strap to the chassis as a ground. The ESD strap must be secured to your wrist and to ground throughout the procedure.

2.In a non-hot swap system, perform an operating system shutdown. Turn the AC or DC power off and remove the AC cord or DC power lines from the system. Remove chassis or system cover(s) as necessary for access to the CompactPCI modules.

Inserting or removing modules in a non-hot swap chassis with power

!applied may result in damage to module components. The MCPN750A is

Caution a hot swappable board and may be inserted in a hot swap chassis such as a

CPX2000, or a CPX8000 series chassis with power applied.

Dangerous voltages, capable of causing death, are present in this equipment. Use extreme caution when handling, testing, and adjusting.

3.Remove the filler panel from the appropriate non-system card slot.

4.Set the VIO on the backplane to either +3.3V or +5V (the MCPN750A is a Universal board), depending upon your cPCI system signaling requirements and ensure the backplane does not bus J3, or J5 signals.

5.Slide the MCPN750A into the appropriate non-system slot. Grasping the top and bottom injector handles, be sure the module is well seated in the P1 through P5 connectors on the backplane. Do not damage or bend connector pins.

1-24

Computer Group Literature Center Web Site

Page 44
Image 44
Motorola IH5 manual Installing the MCPN750A Baseboard