Setting Up Your Server
Installation Procedure for NEC Rack/Third Vendor's Rack
This server can be installed in either the NEC rack or a third vendor's rack. Take the following procedure to install the server in the rack:
IMPORTANT: When installing the optional cable arm, see the instruction manual provided with the cable arm.
Preparation before Installation
The slide rail is fixed with the screw to prevent from falling off during transportation. Remove the left and right core nuts from the front of the server before you install the server in the rack.
Set screw
Core nut
Hold the core nut, and rotate the set screw to remove the core nut.
Keep the removed core nuts for future use.
Removing the Rail Assemblies
Remove the sliding rails from the server.
Hold the rails and slowly slides them toward the rear of the server until a "click" is heard. The click indicates that the rails are locked.
Push the release levers on the right and left sides of the server, and remove the rail assemblies from the server while unlocking.
Release lever