Parker Hannifin G2 manual Preoperation check

Models: G2

1 189
Download 189 pages 16.5 Kb
Page 38
Image 38
4.2Preoperation check

4.2Preoperation check

(1)Items to prepare

Motor unit/driver/sensor/DC power supply

PC utility (floppy disk)

Level block for fixing the motor

PC (with Windows 95/98/98SE/Me/NT4.0/2000 installed)

Various cables

(2)Installation and Wiring

 

 

 

 

 

Positioning

 

 

 

 

 

controller

 

 

 

 

PC utility (software)

 

6) Sensor wiring

 

24V DC

 

 

 

 

power supply

 

 

 

(prepared bycustomers)

 

 

 

 

 

 

 

 

 

 

(prepared by customers)

 

 

Motor part

 

 

TB 2

PC

 

(main body)

 

 

 

 

 

 

CN 1

(prepared by customers)

 

 

Sensor

 

 

 

 

 

 

 

 

 

 

 

CN 4

 

 

Level block

 

 

DrvGII

7) RS232C cable

 

 

 

type

 

 

4) Motor cable

(dedicated)

 

 

driver

CP7576(77)S-020

1) Level block

 

CM0300M(R) -ooo

TB 1

3) Power supply line

(prepared by customers)

 

 

 

 

 

 

 

 

CN 2

 

 

 

5) Encoder cable

 

 

 

 

CE7800M(R)-ooo

 

 

(3) Items to be checked

Check

 

4

1)

Is the main body fixed on the level block?

"

 

2)

Is the motor not interfering with peripherals?

"

 

3)

Is the power supply line wired properly? (LINE, GND)

"

 

4)

Is the motor cable wired properly? (VA, VB, VC. GND)

"

 

5)

Is the encoder cable wired properly?

"

 

6)

Is the sensor wired properly?

"

 

 

(Home position, OT sensor: driver (or positioning controller))

 

 

7)

Is the RS232C cable wired properly?

"

 

8)

Is RS-232C operation enabled?

"

 

 

(Is bit 2 of PSW1 is on?)

 

 

9)

Is the wiring with the positioning controller done properly?

"

 

 

(See a connection example on the following page.)

 

 

4-3

Page 38
Image 38
Parker Hannifin G2 manual Preoperation check