DA500/DA550 Basics • 3
Setting Up A Job (continued)
Setup Example Using # 10 Envelopes:
When you set the feed gap for a number 10 envelope, the width of the envelope will fall completely under the inside and middle
1.In this case, remove the sliding fence, then follow this procedure: (refer to the figure on the next page)
1.Slide the #10 envelope over until it is under both fingers of the outermost
2.Lower the outer
3.With all
2.Center the Wireform under the Material by doing the following:
1.Place a sample piece of material in the feed area, up against the support plate.
2.Push down on the wireframe lock lever to free the wireframe slide.
3.Center the wireframe under your sample piece of material.
4.Pull up on the lock lever to secure the wireframe in position.
Pitney Bowes DA500/DA550 Operator Guide |