Chapter 2 - Hardware Installation

10.Place the MCU in a 23” rack and while supporting it, screw the mounting brackets to the rack securing it with bolts and self-locking nuts.

When the unit is installed on a rack, the rack must be properly grounded to the central office ground. The rack must be grounded with two-hole compression- type connectors using copper conductors (tinned or untinned). Wire, bus bar or braided strap connectors are acceptable.

Mounting the MGC+100 on a 19” Rack

The MGC+100 can be mounted in a 19” rack using the mounting kit (P/N- KIT2026A). It is highly recommended that the 19” rack be located in an air- conditioned room.

When the MGC+100 unit is installed on a 19” rack, environment temprature should not exceed 35°C or 95°F.

Figure 2-3 shows how to mount the MGC+100 on the 19” rack.

19" Attachment Bar

 

Line 1

Line 2

Line 3

Line 4

Line 5

Line 6

Line 7

Line 8

 

 

 

 

 

Line 1

Line 2

Line 3

Line 4

 

 

 

 

 

 

 

 

Power In Out

 

 

 

 

 

 

 

 

Power In Out

MOC YOL P

MGC+

 

 

 

 

 

 

Power In Out

Figure 2-3: MCU Rack Mount

2-8

Page 28
Image 28
Polycom DOC2238A manual Mounting the MGC+100 on a 19 Rack, Shows how to mount the MGC+100 on the 19 rack