
MGC+ Hardware and Installation Manual
Wood Packing Case
Foam Block
Foam Block
Figure 2-2: Unpacking the MGC+100
4.Lift the MGC+100 unit and remove the packaging material.
5.Lower the MGC+100 unit, placing it on the surface.
If the MGC+100 is a standalone unit, place it on a flat surface. If you are rack mounting the MGC+100, allow a minimum clearance of 3” above the unit.