A

4 – Installation Installing the SANbox 6140 Router

Installing the SANbox 6140 Router

Unpack the router and accessories. The SANbox 6140 router is shipped with the following components, shown in Figure 4-1.

„Power cord

„Dongle for connecting the router’s serial port to a workstation used for configuring and managing the router. A standard Cat5 Ethernet cable is required (not supplied) to connect the dongle to the router. The dongle connects directly to the workstation’s serial (COM) port.

Figure 4-1 SANbox 6140 Router and Accessories

To install the SANbox 6140 router:

1.Complete the pre-installation checklist (see page 4-4).

2.Mount the router (see page 4-4).

3.Install the transceivers (see page 4-4).

4.Connect the management workstation to the router (see page 4-5).

5.Configure the management workstation (see page 4-5).

6.Install the management application (see page 4-7).

7.Start the management application (see page 4-8).

8.Connect the router to AC power (see page 4-9).

9.Configure the router (see page 4-9).

10.Cable devices to the router (FC and iSCSI) (see page 4-10).