4 – Installation

Installing the SANbox 6140 Router

S

Pre-installation Check List

During the initial configuration process, the system prompts you to enter the parameters listed in Table 4-2. Fill out the table before installation to expedite the configuration process.

Table 4-2. Pre-installation Checklist

Symbolic name of this router

Management port IP address (if not using DHCP)

Management port subnet mask (if not using DHCP)

Management port gateway IP address (if not using DHCP)

iSCSI Port 1 (GE-1) IP address

iSCSI Port 1 (GE-1) subnet mask

iSCSI Port 1 (GE-1) gateway IP address

iSCSI Port 1 (GE-1) iSNS IP address

iSCSI Port 2 (GE-2) IP address

iSCSI Port 2 (GE-2) subnet mask

iSCSI Port 2 (GE-2) gateway IP address

iSCSI Port 2 (GE-2) iSNS IP address

Mount the Router

You can either place the router on a flat surface or mount it in a 19-inch Electronic Industries Association (EIA) rack. See the product specification for weight and dimensions. Rack mounting requires a QLogic rack mounting kit; contact QLogic for more information.

If you mount the router in a closed or multi-unit rack assembly, make sure the operating temperature inside the rack enclosure does not exceed the maximum rated ambient temperature.

Install the Transceivers

The router supports a variety of SFP transceivers.

„To install a transceiver, insert the transceiver into the port and gently press until it snaps in place.

„To remove a transceiver, gently press the transceiver into the port to release tension, then pull the release tab or lever and remove the transceiver. Different transceiver manufacturers have different release mechanisms. Consult the documentation for your transceiver.

4-4

FI0154601-00 C

Page 50
Image 50
Q-Logic 6140 manual Pre-installation Check List, Mount the Router, Install the Transceivers, Pre-installation Checklist