Schneider Electric HRB1684301-01 user manual Installation and wiring, MID compliance

Models: HRB1684301-01

1 148
Download 148 pages 57.73 Kb
Page 142
Image 142

Chapter 17—MID compliance

 

PowerLogic™ PM5500 series user manual

 

 

 

 

 

 

 

 

 

Mechanical environment

M1

 

 

 

 

Electromagnetic (EMC) environment

E2

 

 

 

 

Applicable measurements

Active energy metering only (kWh or MWh)

 

 

 

 

 

System types (for MID-compliant applications)

3-phase 4-wire Wye grounded

 

3-phase 3-wire Delta ungrounded

 

 

 

 

 

3-phase 4-wire Wye

3 x 57.7 (100) to 3 x 400 (690) V AC

 

Voltage at voltage

grounded

 

 

 

terminals

3-phase 3-wire Delta

3 x 100 to 3 x 600 V L-L

 

 

ungrounded

 

 

 

 

Minimum current

 

50 mA

 

 

 

 

Rated secondary current

5 A

 

 

 

 

 

Maximum current

 

10 A

 

 

 

 

Electrical network frequency

50 Hz

 

 

 

 

 

 

Location

Meter front panel

 

 

 

 

 

Optical pulse output

Frequency

2.5 kHz maximum

 

(energy pulsing LED)

Pulse constant1

10,000 pulses per kWh

 

 

Wavelength

590 to 635 nm

 

 

 

 

1See “MID-protected setup parameters” on page 144 for additional details.

Safety precautions

Installation, wiring, testing and service must be performed in accordance with all local and national electrical codes.

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH

Apply appropriate personal protective equipment (PPE) and follow safe electrical work practices. See NFPA 70E in the USA or applicable local standards.

Turn off all power supplying this device before working on it.

Always use a properly rated voltage sensing device to confirm that all power is off.

Do not exceed the device’s ratings for maximum limits.

Do not use this device for critical control or protection applications where human or equipment safety relies on the operation of the control circuit.

Never short the secondary of a voltage transformer (VT).

Never open circuit a current transformer (CT).

Always use grounded external CTs for current inputs.

Failure to follow these instructions will result in death or serious injury.

1.Turn off all power supplying this device before working on it.

2.Always use a properly rated voltage sensing device to confirm that all power is off.

Installation and wiring

Refer to the installation sheet that shipped with your meter for meter installation and wiring instructions.

Related topics

See “Meter mounting” on page 17 and “Meter wiring” on page 20 for additional information.

142

HRB1684301-01

Page 142
Image 142
Schneider Electric HRB1684301-01 user manual Installation and wiring, MID compliance