Schneider Electric HRB1684301-01 user manual Verifying accuracy, Power, energy and power factor

Models: HRB1684301-01

1 148
Download 148 pages 57.73 Kb
Page 8
Image 8

PowerLogic™ PM5500 series user manual

Maintenance log

126

Chapter 15—Verifying accuracy

127

Testing overview

127

Accuracy test requirements

127

Signal and power source

127

Control equipment

127

Environment

127

Reference device or energy standard

128

Energy pulsing

128

Verifying accuracy test

129

Calculating the number of required pulses

130

Calculating total power

130

Percent error calculation

130

Test points

131

Energy pulsing considerations

131

VT and CT considerations

132

Example calculations

132

Adjustments to allow energy pulsing at the digital outputs

132

Typical sources of test errors

133

Chapter 16—Power, energy and power factor

135

Power (PQS)

135

Power and the PQ coordinate system

135

Power flow

135

Energy delivered / energy received

136

Power factor (PF)

136

True PF and displacement PF

136

PF lead / lag convention

136

Current phase shift from voltage

136

PF sign convention

137

PF sign in IEC mode

137

PF sign in IEEE mode

138

Power factor register format

139

Chapter 17—MID compliance

141

MID overview

141

Scope

141

MID compliance for the meter

141

Specifications relevant to MID

141

Safety precautions

142

Installation and wiring

142

Installing the terminal covers

143

PM5561 default screen

143

Meter firmware version

144

MID-protected setup parameters

144

Lock-protected setup parameters

144

Lock-protected functions

145

Setting up the PM5561

145

Basic setup menu

145

Advanced setup menu

145

Clock setup menu

145

Tariff setup menu

146

Passwords setup menu

146

Initializing the meter

146

Locking or unlocking the meter

146

8

HRB1684301-01

Page 8
Image 8
Schneider Electric HRB1684301-01 user manual Verifying accuracy, Power, energy and power factor, MID compliance