4 - 17
ENG
CARBURETOR
11.Install:
●Needle valve 1
●Float 2
●Float pin 3
NOTE:
●After installing the needle valve to the float,
install them to the carburetor.
●Check the float for smooth movement.
12.Install:
●Pilot screw 1
●Spring 2
●Washer 3
●O-ring 4
* Except for USA
Note the following installation points:
●Turn in the pilot screw until it is lightly
seated.
●Turn out the pilot screw by the number of
turns recorded before removing.
Pilot screw:
1-3/4 turns out (example)
*1-1/2 turns out (example)
13.Install:
●O-ring
●Leak jet 1
●Float chamber 2
●Screw (float chamber) 3
●Cable holder (throttle stop screw cable)
4
●Hose holder (carburetor breather hose)
5
5
3
2
4
5
1
14.Install:
●Diaphragm (air cut valve) 1
●Spring (air cut valve) 2
●O-ring 3
●Air cut valve cover 4
●Screw (air cut valve cover) 5
1
2
3
5
4