AMX IS-SPX-1000/1300 manual Creating and updating a new calendar file

Models: IS-SPX-1000/1300

1 110
Download 110 pages 45.24 Kb
Page 106
Image 106

Appendix

FIG. 123 XML Tree with new attribute param1

9.For PowerOn.svg, click on command and then select the attribute to the right (currently “PowerOn”). Change the command to power and press Enter to save it.

10.Click on target and change it to monitor.

11.Click on param1 and enter On.

12.Repeat steps 6 through 11 for PowerOff.svg. In this case, though, set param1 to “Off”.

Creating and updating a new calendar file

The final step involves setting the two new svg files so they can be accessed by the project. To do this:

1.If you have not already done this, copy the PowerOn.svg and PowerOff.svg files into your project.

2.Right-click the workspace area of your project and select New Schedule.

3.Open the new calendar file named new.ics.

4.Click on the PowerOn.svg file and drag it to the date you want the power to turn on (FIG. 124).

98

Inspired XPress - Programming Guide

Page 106
Image 106
AMX IS-SPX-1000/1300 manual Creating and updating a new calendar file, XML Tree with new attribute param1