AT&T G3 manual Issue 2 April 1996 IN-7

Models: G3

1 287
Download 287 pages 31.55 Kb
Page 287
Image 287

Index

technician checklist,

12-2

prerequisites, xiv

testing

 

software

installation, 8-5

 

installing for first time, 3-3

TCP/IP connection, 3-16

verification, 9-5

translating PBX data,

1-3

software, greater than release

troubleshooting TCP/IP connection, 3-17

2.01, 3-6

tty device names, adding to Devices

updating abbreviated dialing lists, 7-24

file, 7-20

 

user interfaces, changing, 10-13

ttymon port monitors,

4-14

 

 

 

 

 

 

V

 

 

 

 

 

 

U

 

 

 

 

 

 

verifying

 

 

 

 

 

 

 

UNIX, 10-2

 

 

 

device types, 8-14

backing up,

10-5

 

 

dial strings, 8-15

 

commands,

xiv

 

 

group assignments, 4-11

ed editor, xiv

 

 

installation, 10-8

 

group assignments

 

 

installed software,

9-5

definition, 4-11

 

 

UNIX group assignments, 4-11

verifying, 4-11

 

 

vi editor, xiv, C-1

 

maintenance, 10-2

 

 

 

 

permissions, 10-3

 

 

 

 

 

printers, 10-4

 

 

 

 

 

 

 

W

 

removing software,

10-6

 

 

shell commands

 

 

window conventions,

xviii

adding logins,

4-4

 

 

 

 

 

system architecture

 

 

 

 

alarm streams,

6-3

 

 

 

 

vieditor, xiv, C-1 UnixWare, xix

desktop

adding logins, 4-9 definition, 4-9

maintenance administration, 4-13 disk space, 1-6

installing its software, 3-2 maintenance administration, 4-13 methodology, 1-12

desktop, 1-12

shell command-line interface, 1-12 OA&M Administrative Interface, 4-6

Issue 2 April 1996 IN-7

Page 287
Image 287
AT&T G3 manual Issue 2 April 1996 IN-7