Migration from DEFINITY Server R to S8700 fiber-PNC

The full migration from a G3r to an S8700-series Server fiber-PNC system, with traditional or ATM center stage, involves the following simplified steps:

1.Decide which EPNs are to be IPSI connected, and replace processor complexes with IPSIs.

2.Install servers.

3.Install Ethernet switches.

4.Install UPS units.

5.For IPSI-connected port networks, upgrade each EPN.

6.Connect the duplication links.

7.Connect the servers and the IPSIs to the control LAN.

8.Sequentially bring up the duplicated servers.

Figure 43: S8700-series Servers (fiber-PNC configuration) shows the completion of Phase 1, an S8700 fiber-PNC system that supports only traditional endpoints.

Figure 43: S8700-series Servers (fiber-PNC configuration)

Note:

In the traditional PBX system, signaling and bearer traffic for all calls connects through the TDM buses within Port Networks and the ATM or traditional center stage

Issue 6 January 2008 121