Traffic engineering
Figure 68: Inter-site TDM and Media Processing resource requirements
(Resources required at both sites corresponding to a particular
COI
Matrix
I
C
P
TDM: 0
Media: 0
TDM: 1
Media: 1
TDM: 1
Media: 1
“I” denotes IP endpoint; “C” denotes
“P” denotes PSTN trunk
In Figure 68, the usages are presented on an
The overall TDM usage and media processing usage for each site can be calculated from an expanded COI matrix, along with the information from Figure 67 and Figure 68. To illustrate, Example 4: Expanded COI matrices will be further expanded.