2 Unpacking and installing the Brocade DCX 8510-4
Unpacking and installing the Brocade DCX 8510-4
Use the following procedure to unpack and install your Brocade DCX
CAUTION
Use safe lifting practices when moving the product. (C015)
NOTE
A fully populated Brocade DCX
1.Unpack the Brocade DCX
a.Cut the bands that encircle the packaging.
b.Remove the lid and the kits and foam from the top of the chassis.
c.Lift the cardboard box off the chassis and remove the plastic bag from around the chassis. Save the packing materials for use when returning the old chassis.
d.Leave the chassis on top of the plastic shipping tray if the chassis must be transported to the installation location.
NOTE
The Brocade DCX
2.Use a pallet jack or other assisted lift to transport the new chassis to the installation area. Doorways must be wider than 36 in. (91 cm) to accommodate the chassis.
3.Remove the Brocade DCX
4.Remove the chassis door from the Brocade DCX
5.Remove the vertical cable management fingers.
6.Use a lift to raise the chassis to the correct level. If installing the chassis in a cabinet, follow the instructions provided by the rack kit manufacturer.
7.If applicable, lock the wheels of the lift.
8.Gently slide the chassis onto the final installation surface, ensuring that it remains supported during the transfer.
9.Ensure that the chassis is oriented so that the nonport side has access to intake air (cool).
10.Reinstall the vertical cable management fingers.
11.Reinstall the door. The door must be installed to meet EMI compliance.
16 | Brocade DCX |
|