5 Core switch blade
4.Pack the faulty CP blade in the packaging provided with the new CP blade, and contact the switch supplier to determine the return procedure.
5.Replace the chassis door.
If you have one or more application blades in the chassis, the Fabric OS automatically detects mismatches between the active CP firmware and the application blade's firmware and triggers the
Core switch blade (CR16-4) removal and replacement
This section describes how to remove and replace a core switch blade
Time and items required
The replacement procedure for the core switch blade takes approximately 30 minutes. The following items are required for the core switch blade replacement:
•ESD (electrostatic discharge) grounding strap.
•Phillips #2 screwdriver.
•Replacement core switch blade
Faulty core switch blade indicators
Confirm that you need to replace the core switch blade before continuing. The following events might indicate that a core switch blade is faulty:
•The status LED on the core switch blade is lit steady amber, or the power LED is not lit.
•The slotShow command does not show that the core switch blade is enabled.
•The haShow command indicates an error.
•Any of the following messages display in the error log:
-“Slot unknown” message relating to a core switch slot
-Core switch blade errors or I2C timeouts
-FRU: FRU_FAULTY messages for a core switch blade
-Configuration loader messages or “Sys PCI config” messages
-Generic system driver messages (“FABSYS”)
-Platform system driver messages (“Platform”)
-EM messages that indicate a problem with a core switch blade
-Function fail messages for the core switch master
76 | Brocade DCX |
|