C H A P T E R 5

Configuring the MGX 8230 Shelf

Summary of Shelf-Level Tasks

This chapter describes the shelf-level tasks used to bring up and configure the MGX 8230. These tasks are performed after all hardware is installed and the power is on and alarm-free.

The initial tasks require the use of the command line interface (CLI) on an ASCII terminal.

Subsequent steps are performed with either the CiscoView application or the CLI.

This chapter contains the following sections:

User Interface Access Ports, page 5-2

MGX 8230 MGX to BPX Feeder, page 5-3

Initial MGX 8230 Bring-Up, page 5-3

Configuring Node-Level Parameters, page 5-6

CiscoView Configuration of a Feeder, page 5-13

Note The words “switch,” “node,” and “shelf” are synonymous for the MGX 8230 product.

The word “bay” refers to the upper or lower half of the enclosure.

 

 

Cisco MGX 8230 Edge Concentrator Installation and Configuration

 

 

 

 

 

 

 

Release 1.1.31, Part Number 78-11215-03 Rev. B0, May 2001

 

 

5-1

 

 

 

 

 

Page 153
Image 153
Cisco Systems MGX 8230 manual Summary of Shelf-Level Tasks, Word bay refers to the upper or lower half of the enclosure