1-7
Cisco SFS 7012 InfiniBand Server Switch Hardware Users Guide
OL-8787-05
Planning the Installation

Rack Specifications and Recommendations

The SFS 7012 switch is designed to be installed in an existing 19-inch equipment rack or server rack.
Note The SFS 7024 switch is designed for a four-post server cabinet. It is not designed for a two-post t elco
cabinet.
Racks should conform to conventional standards. In the United States, use American National Standards
Institute (ANSI)/Electronic Industries Association (EIA) standard ANSI/EIA-310-D-92, and
International Electrotechnical Commission (IEC) 297
Racks should meet the following mechanical recommendations:
Four-post, 19" rack to facilitate easy maintenance
Universal mounting rail hole pattern identified in IEC Standard 297
Mounting holes flush with the rails to accommodate the switch
Use a rack grounding kit and a ground conductor that is ca rried back to earth or to another suitable
building ground. Ground the equipment rack to earth ground.
Provide enough room to work on the equipment. Clear the work site of a ny unnecessary materials.
Make sure the equipment will have enough clearance for front and rear access.
¡Advertencia!
Puede haber energía o voltaje peligrosos en los terminales eléctricos de CC. Reemplace siempre la
cubierta cuando no estén utilizándose los terminales. Asegúrese de que no haya acceso a
conductores descubiertos cuando la cubierta esté colocada.
Varning!
Farlig spänning eller skadlig energi kan finnas i likströmsterminalerna. Sätt alltid tillbaka höljet när
terminalerna inte används. Försäkra att inga oisolerade ledare kan nås när höljet sitter på plats.