Note The 2 front holes should match up with the top and bottom holes of the rail front flange.
All holes should correspond to the rail mounting positions (i.e., the holes marked with pen or tape).
Step 2 Fasten the rail back flange (chassis leaf module side) to the rack by installing two screws into the rail and rack.
Figure 1 | Rail Back Flange |
Install 2 screws to top and bottom holes
Step 3 Fasten the rail front flange (chassis fan side) to the rack by installing one screw into the top hole of each rail.
Figure 2 | Rail Front Flange |
Install 2 screws to
top and bottom holes
Install the second rail on the other side of the rack by repeating steps 1 through 3.
Rack-Mount the Switch
Caution Because of its size and weight, it is recommended that either a lifting device or three (3) people install the SFS 7012.
Cisco SFS 7012 InfiniBand Server Switch Hardware Users Guide
| ||
|