Chapter 4 Cabling the RF Switch With the Cisco uBR10012 CMTS Cable Interface Line Cards
Installing the Header Blocks on the Cisco uBR 3x10 RF Switch
Installing the Header Blocks on the Cisco uBR 3x10 RF Switch
The RF cables are connected to the CMTS, PROTECT, and CABLE PLANT portions of the RF switch using the header blocks. Header blocks are installed on the RF switch at the following locations:
•
•
•CABLE
Equipment
•18 header
•34 header
•
To install the header blocks, complete the following steps:
Step 1 With the beveled edge of the header block at the top, align the two alignment pins on the header block with the two alignment holes on the RF switch (CMTS, PROTECT, or CABLE PLANT section).
Step 2 Press the header block into place, using equal pressure on both the upper and lower portions of the header block.
Step 3 Use a
Note Tighten the header blocks to the Cisco uBR 3x10 RF Switch only after installing and gently pulling on the cables to be sure that they are firmly seated in the header block.
Caution Do not overtighten. We recommend tightening to 5 to 7
Figure
Alignment pins
Header Block Description
Header block (top)
Bevel
Screws