Chapter 2 Preparing for Installation

Verifying the Shipping Container Contents

In addition, you might need the following cables:

Straight through cable

Rollover cable

Crossover cable

Verifying the Shipping Container Contents

When you receive your Cisco uBR 3x10 RF Switch, use the following procedure to check the contents of the shipping container. Use the installation checklist and the component list to ensure that you received all the components you ordered.

Note Do not discard the shipping container. You will need the container if you move or ship your Cisco uBR 3x10 RF Switch in the future.

Step 1 Verify that the following are included in the shipping container (the accessories box might be separate):

One Cisco uBR 3x10 RF Switch chassis containing all the components you ordered for your system

One or more accessories boxes (some or all might be shipped separately)

Step 2 Check the contents of the accessories box against the installation checklist and the packing slip to verify that you received all listed equipment, which should include everything listed in Table 2-2and any ordered Cisco IOS software or other documentation.

Step 3 After provisioning the headend as documented in the next section, refer to the “Rack-Mounting the RF Switch with the Cisco uBR10012 CMTS” section on page 3-3to begin the installation.

Cisco uBR-3x10 RF Switch Hardware Installation and Cabling Guide

 

OL-1984-06

2-11

 

 

 

Page 35
Image 35
Cisco Systems UBR-3X10 manual Verifying the Shipping Container Contents