
Chapter 2 Preparing for Installation
Tools for Installation
Caution To prevent the chassis from overheating, never install the Cisco uBR 3x10 RF Switch in an enclosed rack or room that is not properly ventilated or air conditioned. The Cisco uBR 3x10 RF Switch overheats if the input air temperature reaches 105°F (41°C).
Figure | Dimensions |
15.12 in.
(384.05 mm)
5.22 in.
(132.59 mm)
17.0 in.
(431.8 mm)
Tools for Installation
82134
Your Cisco uBR 3x10 RF Switch is fully assembled at the factory; no assembly is required. However, you need the following tools and equipment to install
•Number 2 Phillips screwdriver (extended length)
•
•
•
•
•MCX connector removal tool (see Figure
Figure 2-3 MCX Connector Removal Tool
|
| 72510 |
|
|
|
|
| Cisco |
|
| |
|
|
| |||
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|