Chapter 2 Preparing for Installation

Tools for Installation

Cable management bracket (optional)

Figure 2-4 Optional Cable Management Bracket for the Cisco uBR10012 Chassis

62695

Tape measure (optional)

Level (optional)

14 American Wire Gauge (2.5 mm2) cable with a minimum of three conductors rated for at least 140°F (60°C) (for DC-input power supply installations only)

Standard wire stripper (for grounding wire and DC-input power supply installations)

Tape (for securing the handle of a DC circuit breaker in the OFF position when a DC-input power supply is powered down)

The rack-mount kit includes the following parts:

Two rack-mount brackets for mounting the chassis in the rack

Four M5 x 8-mm Phillips countersunk screws to secure the rack-mount brackets to the chassis To verify your plant’s RF setup, you need the following:

Cisco uBR 3x10 RF Switch cabling bundles supplied by Cisco Systems, Inc. or WhiteSands Engineering, complete with header blocks and MCX connectors. For more detailed information, refer to the “RF Cable Assemblies” section on page 4-4and “Specifications and Component Part Numbers” section on page A-1.

Vecima HD4040 series IF-to-RF upconverter (when needed)

RF spectrum analyzer

For coaxial cabling:

Diplex filters and splitters

Coaxial cable crimping tool

New coaxial cable

Coaxial jumpers that are at least two to three feet long (maximum of five feet)

For fiber networks, fiber-optic laser receivers for each upstream channel

Assorted RF attenuators (with at least two 20-dB attenuators)

Cisco uBR-3x10 RF Switch Hardware Installation and Cabling Guide

2-10

OL-1984-06

 

 

Page 34
Image 34
Cisco Systems UBR-3X10 manual Cable management bracket optional