omconfig Delay Battery Learn Cycle

Use the following omconfig command to delay the battery learn cycle for a specified period of time. The battery learn cycle can be delayed for a maximum of seven days or 168 hours.

Complete Syntax

omconfig storage battery action=delaylearn controller=id battery=id

days=d hours=h

where id is the controller ID and battery ID as reported by the omreport command. To obtain this value, enter omreport storage controller to display the controller IDs and then enter omreport storage battery controller=ID to display the ID for the controller battery.

Example Syntax

For example, to delay the learn cycle for three days and 12 hours on controller 1, enter:

omconfig storage battery action=delaylearn controller=1 battery=0

days=3 hours=12

omconfig Connector Commands

The following sections provide the omconfig command syntax required to execute connector tasks.

Table 8-25. omconfig Connector Commands

Required Command Levels (1, 2, 3) Optional name=value pairs

omconfig storage connector

action=rescan controller=id connector=id

omconfig Rescan Connector

Use the following omconfig command to rescan a controller connector. This command rescans all connectors on the controller and is therefore similar to performing a controller rescan.

NOTE: This command is not supported on SAS controllers.

Complete Syntax

omconfig storage connector action=rescan controller=id connector=id

where id is the controller ID and the connector ID as reported by the omreport command. To obtain these values, enter omreport storage controller to display the controller IDs and then enter omreport storage connector controller=ID to display the IDs for the connectors attached to the controller.

178

Using the Storage Management Service

Page 178
Image 178
Dell Command Line Interface Omconfig Connector Commands, Omconfig Delay Battery Learn Cycle, Omconfig Rescan Connector