HP nPartitions (nPars) manual Supercap pack mounting kit, Installing the Supercap mounting bracket

Models: nPartitions (nPars)

1 148
Download 148 pages 8.77 Kb
Page 51
Image 51

Supercap pack mounting kit

The HP Smart Array P711m Controller includes a cabled Supercap Pack which mounts inside the server using the orderable AM341A Mounting Kit for Low profile battery (HP part number AD399-2132A KIT, RAID BATTERY HOLDER). This kit contains a black metal mounting bracket and a mezzanine card blank. The mounting bracket clips onto a mezzanine card in slot 1. If no card is used in slot 1, the mezzanine card blank included in the kit must be installed to mount the bracket.

For installing the bracket on to the server blade, the mounting bracket has:

A mezzanine post loop that slides over the abutting mezzanine 2 post

A thumbscrew clip that clips over the mezzanine 1 card or mezzanine blank thumbscrew located at the rear of the blade

• A mezzanine foot that clips over the edge of the mezzanine 1 card or mezzanine card blank that is installed closest to the center of the blade

For installing the Supercap Pack onto the bracket, the mounting bracket has:

A C-hook to restrain the cable

Two restraining clips to restrain the Supercap Pack

1 Mezzanine foot

3 Cable restraining clips

4 C-hook

2Mezzanine post loop

Installing the Supercap mounting bracket

1.Power off the server blade and remove it from the server blade enclosure (“Preparing the server blade for servicing”).

2.Remove the access panel (“Access panel” (page 106)).

3.Remove the DIMM baffle (“DIMM baffle” (page 108))

4.Temporarily remove any mezzanine card installed in slot 2 (“Mezzanine cards” (page 115)).

NOTE: Mezzanine slot 1 must contain the P711m Controller, another mezzanine card, or the mezzanine card blank. If you are installing the P711m card in mezzanine slot 1, do so now following the instructions “Installing the P711m Controller Board.” If you are not installing the P711m card in mezzanine slot 1, and no other mezzanine card is present in slot 1, then install the mezzanine card blank at this time.

5.Clip the mounting bracket onto the mezzanine card or mezzanine card blank.

Installing internal components

51

Page 51
Image 51
HP nPartitions (nPars) manual Supercap pack mounting kit, Installing the Supercap mounting bracket