Table 4 Site Inspection Checklist (continued)
Check either Yes or No. If No, include comment number or date. | Comment or Date | |
Number | Area or Condition | Yes No |
31. | Are cabinets available for tape and disc media? |
|
32. | Is shelving available for documentation? |
|
Training |
|
|
Number | Area or Condition |
|
33. | Are personnel enrolled in the System Administrator’s Course? |
|
34. | Is |
|
Power subsystem
The power subsystem is located on the system board. The BL860c i4 Server Blade receives 12 Volts directly from the enclosure. The voltage is immediately passed through an
ESD handling information
CAUTION: Wear an ESD wrist strap when handling internal server components. Acceptable ESD wrist straps include:
•The wrist strap that is included in the ESD kit with circuit checker (part number
•The wrist strap that is included in the ESD kit without circuit checker (part number
If the above options are unavailable, the throw away (one use only) strap that ships with some HP memory products can also be used, with increased risk of electrostatic damage.
When removing and replacing server components, use care to prevent injury and equipment damage. Many assemblies are sensitive to damage by electrostatic discharge.
Follow the safety precautions listed to ensure safe handling of components, to prevent injury, and to prevent damage to the server blade:
•When removing or installing a server blade or server blade component, review the instructions provided in this guide.
•Do not wear loose clothing that might snag or catch on the server or on other items.
•Do not wear clothing subject to static charge
•If installing an internal assembly, wear an antistatic wrist strap, and use a grounding mat such as those included in the Electrically Conductive Field Service Grounding Kit.
•Handle components by the edges only. Do not touch any
Unpacking and inspecting the server blade
Be sure that you have adequately prepared your environment for your new server blade, received the components that you ordered, and verified that the server and the containers are in good condition after shipment.
12 Site preparation