HP nPartitions (nPars) manual Customer and HP Information, Site Inspection Checklist

Models: nPartitions (nPars)

1 148
Download 148 pages 8.77 Kb
Page 10
Image 10

Operating

20% to 80%

Non-operating

5% to 95%

1All temperature ratings shown are for sea level. An altitude derating of 1°C per 304.8 m (1.8°F per 1000 ft) to 3048 m (10,000 ft) is applicable. No direct sunlight allowed. Upper operating limit is 3,048 m (10,000 ft) or 70 Kpa/10.1 psia. Upper non-operating limit is 9,144 m (30,000 ft) or 30.3 KPa/4.4 psia.

2Storage maximum humidity of 95% is based on a maximum temperature of 45°C (113°F). Altitude maximum for storage corresponds to a pressure minimum of 70 KPa.

For more information on the c-Class enclosures, go to http://h71028.www7.hp.com/enterprise/ cache/316735-0-0-0-121.htmlf.

For more site preparation information, go to http://www.hp.com/go/Blades-docs, select HP Integrity BL860c i4 Server Blade in the list of servers, and then select the Generalized Site Preparation Guidelines.

Sample Site Inspection Checklist

 

 

Table 3 Customer and HP Information

 

 

Customer Information

 

 

Name:

 

Phone number:

 

Street address:

City or Town:

 

State or province:

Country

 

Zip or postal code:

 

 

Primary customer contact:

Phone number:

 

Secondary customer contact:

Phone number:

 

Traffic coordinator:

Phone number:

 

 

 

HP information

 

Sales representative

Order number:

 

Representative making survey

Date:

 

Scheduled delivery date

 

 

Table 4 Site Inspection Checklist

 

 

Check either Yes or No. If No, include comment number or date.

Comment or Date

Computer Room

 

 

Number

Area or condition

Yes

No

1.

Is there a completed floor plan?

 

 

2.Is adequate space available for maintenance needs? Front 36 inches (91.4 cm) minimum and rear 36 inches (91.4 cm) minimum are recommended clearances.

3. Is access to the site or computer room restricted?

4.Is the computer room structurally complete? Expected date of completion?

5. Is a raised floor installed and in good condition?

6. Is the raised floor adequate for equipment loading?

7. Are channels or cutouts available for cable routing?

10 Site preparation

Page 10
Image 10
HP nPartitions (nPars) manual Customer and HP Information, Site Inspection Checklist