installation, the bottom of the screen keeps you apprised of the installation’s progress.
17After the installation is complete, use the arrow keys to position the cursor on commit as follows:
setup | Initial Intel Cache Setup |
install | Install Intel Cache |
Commit Setup Changes |
18Pressing the Enter key starts the final phase of the initialization process as well as the cache application. The bottom of the screen indicates that the cache application has started and prompts you to press the Enter key a second time.
19When the Initialization Complete! prompt appears, press the Enter key to reboot the appliance. Rebooting the appliance takes several minutes. During the reboot process, random characters might appear in the window of the VT100 terminal emulator screen.
20After your system completes the boot procedure, a console login prompt appears with fields for both a login and password. At the prompt, supply admin for both the login and password, and press Enter.
21After the login completes, the initial menu appears with additional selections:
setup | Initial Intel Cache Setup |
Main Intel Cache Controls | |
config | Intel Cache Configuration |
monitor | View Statistics |
expert | Enter Expert Mode |
save | Save Config to Floppy |
load | Load Config from Floppy |
logoff | Logoff |
Note The system starts with factory settings. You can further configure or customize the appliance by following the guidelines in Chapter 4‚ Configuring the Appliance.
Once the software is running, you can access the system through a web browser by using the system’s IP Address with an appended :8081 as the URL. For information on accessing the manager UI, refer to Accessing the Manager UI‚ on page 12.
Chapter 2 Getting Started | 11 |