DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127 Issue 1
August 1997
Maintenance Object Repair Procedures
Page10-381DAT-LINE (Data Line)
10
3. Issue the release board PCSS command to release the Data Line
circuit pack on which this port resides.
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when
inspecting errors in the system. By clearing error codes associated with the
Digital Loop Around Test,
for example, you may also clear errors generated from
other tests in the testing sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may be
observed. This test is usually part of a port’s Long Tes t Sequence and takes
about 20 to 30 seconds to complete.
1. D = Destructive; ND = Nondestructive
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
Digital Loop Around Test (#171) X X ND
NPE Crosstalk Test (#6) X ND
Conference Circuit Test (#7) X ND
Audit Update Test (#36) X X ND
Table 10-122. TEST #6 NPE Crosstalk Test
Error
Code Test
Result Description/Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000 ABORT System resources required to run this test are not available. The port may
be in use on a valid call. Use stat us data-module to determine when the
port is available for testing.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1001 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1minute intervals a maximum of 5 times.
Continued on next page