DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127 Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids

Page8-358test journal-printer

8
Feature Intera c tions
The maintenance of a particular component on a link sometimes interferes with the maintenance of the link itself. Maintenance can put a link component in a busy state causing link set-up to fail. Frequent attempts at re-setup of a link may delay the recovery of a faulty component due to the maintenance test of a component only taking place when the component is idle. Therefore, the
1. If no alarms are registe red against the maintenance object then the test seque nce is run only once. The
long clear
option forces a clear of al l ala rms if n o erro rs are encou nte red du ring t esti ng. Th e
short clear
option only clears alarms
pertinent to tests in the short sequence.
2. Refer to the Report Scheduler an d System Printer feature specifica tion for more details.
Action/Object Qualifier Qualifier Description Permissions Defaults Feature
Interactions
test
journal-printer pms-log
wakeup-log
short
long
repeat
number
clear
schedule
Tests the link to the pms lo gging
printer (maintenance nam e =
PMS-PRNT)
Tests the link to the wakeu p logging
printer (maintenance nam e =
JNL-PRNT)
Option for a brief series of
nondestructive diagnostic te sts.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
Number of times each test i n the
sequence is repeated (1-100)
This option causes the te st sequence
(short or long) to repeat until the alarm
(if any) is cleared or a single te st in the
sequence fails.1
Command is validated and t hen a
scheduling form displays to schedule
execution of the command. The
command is then placed in the
command queue and is executed at
the specified time. The inf ormation
displayed by the command is sent to
the system printer instead of the
screen.2
Examples:
test journal-printer pms-log l
test journal-printer pms-log l
schedule
test journal-printer wakeup-log r 2
test journal-printer wakeup-log r 2
schedule
test journ pm r 3
test journ pm r 3 schedule
init
inads
craft
Test
sequence
= short;
repeat = 1
See below