DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127 Issue 1
August 1997
Maintenance Object Repair Procedures
Page10-271CARR-POW (Carrier Port Power Unit) for DC-Powered Systems
10
6. Insert the power unit into the carrier until some resistance is felt.
7. Lift the locking lever upward until it latches.
8. Move the locking lever slide on the power unit to the extreme right
position.
9. Connect the power cord.
10. If this is a 645B power unit, set the power switch to ON.
Hardware Error Log Entries and Test to Clear
Values
Notes:
a. Where P is an appropriate port network number taken for the Port field of
the Error Log.
b. Run the Power Unit Query Test (#127) first using the test environment P r
2 command. Then, if a carrier must be recycled to clear the CARR-POW
alarm, use the recycle carrier PC command to run the Power Unit
Recycle Test (#126). The Power Unit Recycle Test (#126) is not in cluded
in either the long or Short Test Sequences.
!WARNING:
The Power Unit Recycle Test (#126) is destructive. For more information, refer to the description of this test.
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when
inspecting errors in the system. By clearing error codes associated with the
Battery & Battery Charger Query Test
, for example, you may also clear errors
generated from other tests in the testing sequence.
1. Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the
appropriate test description and follow the recommended procedures.
Carrier Port Power Unit E rr o r Log Entries
Error
Type Aux
Data Associated Test Alarm
Level On/Off
Board Test to Clear Value
010 Any Any Any t est environment P sh r 1
1(a)(b) 0 or 1 Power Unit Query
Test (#127) MAJOR ON test environment P r 2