DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127 Issue 1
August 1997
Maintenance Object Repair Procedures
Page10-594ETR-PT (Enhanced Tone Receiver Port)
10
at a time when it is convenient to remove a clock board from the system.
Follow the procedures described in the TONE-BD section for replacing a
tone/clock circuit pack.
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the following tables when
inspecting errors in the system. By clearing error codes associated with the
Tone Detection Verification Test
, for example, you may also clear errors generated
from other tests in the testing sequence.
Tone Detection Verification Test (#42)
This test checks out a single ETR port in the touch-tone receiver mode MFC tone
detection/generation mode and general purpose tone detection mode. During
the first portion of the test, the touch-tone receiver mode is tested. The n general
purpose call progress and maintenance tones are tested and lastly MFC tones
are tested.
1. D = Destructive; ND = Nondestructive
Order of Investigation Short Test
Sequence Long Test
Sequence D/ND1
Tone Detection Verification Test (#42) X X ND
Tone Detection Audit/Update Test (#43) X X ND
Table 10-205. TEST #42 Tone Detection Verification Test
Error
Code Test
Result Description/ Recommendation
none ABORT The system was not able to allocate all the resources needed for this test
OR there was an Internal System Error.
1 ABORT The system could not all ocate all the resources needed to test the tones.
1001 ABORT The system was unable to put the ETR-PT in the appropriate mode to test
it.
Continued on next page