DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127 Issue 1
August 1997
Maintenance Object Repair Procedures
Page10-717ISDN-PLK (ISDN-PRI Signaling Link Port)
10
FAIL The Loopback test has failed.
1. If this test fails repeatedly wait until all of the po rts on t he boa rd are id le
(not in use) and reset the circuit pack. To reset the circuit pack enter
the commands busyout board PCSS and reset PCSS.
2. Repeat the test, and if the test continues to fail replace the circuit pack.
PASS 1. Connectivity of the D-channel over the Packet Bus is operational.
Table 10-240. TEST #939 Signaling Port Packet Bus Loopback — Continued
Error
Code Test
Result Description/ Recommendation
Continued on next page